VRE
Early data — logging since Aug 2026
VRE — this week by line
How reliably each VRE line ran this week, day by day — pick a day that jumps out to share it.
Fredericksburg Line
Fredericksburg| Tue 9/8 | Wed 9/9 | Thu 9/10 | Fri 9/11 | |
|---|---|---|---|---|
| Toward Washington | 97% | 100% | 95% | 78% |
| Away from Washington | 75% | 53% | 89% | 90% |
Worst day this week: Tue 9/8, only 86% on time, typically 0 min late, worse-run trains ~0 min late.
Manassas Line
Manassas| Tue 9/8 | Wed 9/9 | Thu 9/10 | Fri 9/11 | |
|---|---|---|---|---|
| Toward Washington | 97% | 97% | 98% | 92% |
| Away from Washington | 85% | 77% | 94% | 94% |
Worst day this week: Tue 9/8, only 91% on time, typically 0 min late, worse-run trains ~0 min late.
The number in each cell is the share of trains on time that day — higher is better. The background colour grades that same number, so each row reads at a glance.
- 85%+ on time
- 70–85% on time
- 55–70% on time
- Under 55% on time
Have an iPhone? Trackside’s app does live train tracking and arrival alerts for MARC today — VRE support is on the way.